EDD Architecture Interior — Official logo

ED DESIGN
HONG KONG

Architecture · Interior
01ProjectsSelected work02InsightsDesign knowledge03StudioThe practice04TrustCredentials05ProcessHow we work06EnquireStart a conversation

Project enquiry

Tell us about your space →STUDIO@ED-DESIGN.CO / HONG KONG
ED Design Wan Chai showroom with white wall panelling, a display table and black pendant lights

THE ED DESIGN PROCESS / 01—06

From understanding your space to a considered handover.

Design extends beyond a proposal. From our first conversation through drawings, sourcing, site work and handover, each stage has a clear purpose and decision point.

ED / 06

01 — 06 / JOURNEY

Six stages. One considered journey.

01Discovery & Kick-off02Conceptual Design03Design Development04Documentation & Procurement05Site Supervision & Installation06Handover, Walkthrough & Aftercare
0101 / BEGIN WITH YOUDiscovery & Kick-offPurposeUnderstand your needs and establish the scope, budget and programme framework.
  1. 01

    One-to-one consultation

    Meet at our studio or on site to discuss the space—residential, commercial or show flat—your routines, design preferences, practical needs, budget range and preferred timeline.

  2. 02

    Site survey & documents

    Measure the site, record its structure, services, daylight and surroundings, and gather existing architectural drawings.

  3. 03

    Project proposal

    Set out the service scope, team, fee structure, stage deliverables and programme. Once both parties approve and sign the engagement documents, reserve the design schedule and begin.

0202 / SET THE DIRECTIONConceptual DesignPurposeTranslate ideas into a visual direction and establish the spatial framework.
  1. 01

    Space planning

    Explore circulation, functional zones and an initial furniture layout.

  2. 02

    Mood & atmosphere

    Develop a mood board, material and colour references, lighting ideas and preliminary plans.

  3. 03

    Review & feedback

    Discuss the concept with you, refine it in response to feedback and progress to detailed design once the direction is approved.

0303 / DEFINE THE DETAILSDesign DevelopmentPurposeResolve the details into drawings and specifications that can guide construction.
  1. 01

    Detailed drawings

    Develop plans, elevations, reflected ceiling and lighting layouts, electrical and plumbing positions, bespoke joinery details and floor and wall finish plans.

  2. 02

    Materials & bespoke pieces

    Review and select samples for paint, stone, timber, textiles, lighting and bathroom fittings; agree the direction for bespoke furniture and art.

  3. 03

    3D views & approval

    Create rendered views to preview the finished space, incorporate your feedback and obtain sign-off on the final design.

0404 / PREPARE TO BUILDDocumentation & ProcurementPurposePrepare the technical information and supply chain for delivery.
  1. 01

    Construction documents

    Provide technical drawings, material schedules and workmanship standards for contractors, trades and fabricators; coordinate with architectural, structural and building-services teams.

  2. 02

    Sourcing & order tracking

    Coordinate quotes, orders, dispatch and delivery checks for bespoke pieces, imported materials, furniture and art with our supplier and artisan network. Track logistics, share progress and manage budget and lead-time risks.

0505 / BRING IT TO LIFESite Supervision & InstallationPurposeProtect the design intent and check quality at key points on site.
  1. 01

    Pre-start briefing

    Bring the design team, contractor and trades together on site to review drawings, construction benchmarks and critical details.

  2. 02

    Milestone inspections

    Visit at key stages to check materials, dimensions and workmanship, addressing unforeseen site conditions before they compromise the design.

  3. 03

    Installation & styling

    After construction, coordinate furniture, lighting, textiles and art, layer in the final styling and arrange your on-site review and reveal.

0606 / CONTINUE THE CAREHandover, Walkthrough & AftercarePurposeHand over the space smoothly and support its use over time.
  1. 01

    Joint walkthrough

    Review the completed space together, record any adjustments in a punch list and resolve outstanding defects.

  2. 02

    Handover documents

    Provide equipment instructions, material care guidance and relevant warranty documents.

  3. 03

    Aftercare

    Follow up after completion and advise on upkeep, small adjustments and additional furnishing, maintaining a long-term project relationship.

THE ED DIFFERENCE

What makes our process different

  1. 01

    Integrated from the start

    Plan construction finishes, lighting, bespoke joinery, soft furnishings and art together to reduce visual and dimensional gaps between stages.

  2. 02

    Transparent approvals

    You sign off on key deliverables at each important stage before we move forward, reducing unexpected changes and budget overruns.

  3. 03

    One project lead

    A single point of contact coordinates designers, trades and suppliers, simplifying communication across teams.

  4. 04

    Built for real life

    Consider buildability, material lead times and future care from the outset—not only how the space looks in a rendering.

YOUR NEXT STEP

The next step starts with a conversation.

Tell us a little about your project and timeline. We will get in touch to discuss a suitable consultation.

Request a consultation

The agreed project proposal and engagement documents define the actual scope, deliverables and aftercare for each commission.

Street-facing exterior of the new ED Design Wanchai flagship showroom

BEGIN WITH THE RIGHT QUESTIONS

Your space
deserves to be understood first.

Submit project details
EDD Architecture Interior official logo

Architecture · Interior
Hong Kong

ExploreProjectsStudioTrustProcess
Contactstudio@ed-design.co +852 9294 9487WhatsApp +852 9294 9487Shenzhen +86 186 7646 1941
Studios & Hours
Hong KongPrimary studio
Shop A & B, G/F & M/F, Wan Fung Mansion
245–247 Lockhart Road, Wan Chai, Hong Kong

Office hoursMonday–Friday 09:30–18:30
Closed Saturday and Sunday

ShenzhenBy appointment
Unit G, 27/F, Block B, Honglong Century Plaza
Shennan East Rd, Luohu District, Shenzhen
Guangdong Province, China

VisitsYou may first complete our project form so we can prepare a more considered meeting, or contact us on WhatsApp.

© ED DESIGN LIMITEDFORM · FUNCTION · DELIVERYHONG KONG · SHENZHEN

Privacy choices

Choose analytics and advertising

Essential storage keeps language, sign-in and forms working. Analytics and Meta stay off until you choose; contact details and message text are never sent.